| Client: | Confidential |
| Location: | |
| Project: | Bulk Powder & Packaging |
| Scope: | Engineering |
| Value: | $1MM USD |
- Designed an extended monorail structure to improve loadout efficiency at client’s Finishing 2 area, enabling longer rail support with enhanced forklift access.
- Engineered structural steel modifications, including new support columns and beams, while maintaining existing vertical clearance constraints.
- Provided detailed steel framing plans and sections, ensuring seamless integration with existing infrastructure.
- Delivered proactive project management, including weekly stakeholder meetings and schedule/cost tracking to ensure alignment and transparency.
- Collaborated closely with client, leveraging plant standards and site data to accelerate design readiness for construction.