PROJECT:
Luwa Project

Dioxane Stripper Project

Client:Luwa Project
Location:
Project:Dioxane Stripper Project
Scope:Engineering/Estimating/Bid Documents
Value:$1.6M USD
  • Delivered a regulatory-driven process upgrade by repurposing and relocating major equipment, avoiding $12MM in new capital spend.
  • Accelerated project completion by 8 months, collaborating closely with LUWA to streamline reviews and fast-track execution.
  • Completed engineering from FEL2 through FEL3 with bid-ready orthographic drawings and a detailed TIC estimate.
  • Executed full 3D scanning and modeling of equipment layout and 1,500 feet of piping across 9 runs in an operating facility.
  • Provided integrated structural, electrical, and controls design, completing the project in just 8 weeks without disrupting operations.