Grignard Reaction

Client: | Renessenz |
Location: | Florida, USA |
Project: | Grignard Reaction |
Scope: | Engineering & Construction Management |
Value: | $6MM USD |
Installation of two medium pressure reactors required for a Grignard reaction modifying menthol. Vessels were installed in an existing building requiring modification for containment in the event of a reactor meltdown. New raw material storage was installed as well as standalone utilities with backup power to allow safe operation in the event of a power outage.
Results:
Project was completed on time and within budget allowing the client to meet production requirements.