
Dioxane Stripper Project
| Client: | Luwa Project |
| Location: | |
| Project: | Dioxane Stripper Project |
| Scope: | Engineering/Estimating/Bid Documents |
| Value: | $1.6M USD |
- Delivered a regulatory-driven process upgrade by repurposing and relocating major equipment, avoiding $12MM in new capital spend.
- Accelerated project completion by 8 months, collaborating closely with LUWA to streamline reviews and fast-track execution.
- Completed engineering from FEL2 through FEL3 with bid-ready orthographic drawings and a detailed TIC estimate.
- Executed full 3D scanning and modeling of equipment layout and 1,500 feet of piping across 9 runs in an operating facility.
- Provided integrated structural, electrical, and controls design, completing the project in just 8 weeks without disrupting operations.