PROJECT:
Project Tripod

Client:Confidential
Location:
Project:Project Tripod
Scope:Engineering & Construction Management
Value:$72M USD
  • Capacity Increase Project for a Large Chemicals Client
  • Executed Engineering and Construction Management
  • EPC Phase Complete Based on Design Basis Documents
  • 80% of Construction Occurred During Scheduled Plant Shutdowns – From 4-18 Days
  • Jedson Team Recognized By Client for Conformity to Schedule, Cost Control and Responsiveness to Changes in Scope
  • Most Complex Shutdown Ever Undertaken at This Plant
  • 100+ Pieces of Equipment Procured / Tracked / Stored / Installed
  • Project Utilized as a Model for Future Construction Projects
  • 21 Day Shutdown Condensed to 14 Days with Pre-planning